Our work

Court Projection Delivered in 7 days

Fairfield Public Schools: Court Projection Delivered in 7 days

Six Immersivegroup projection systems, run by Immersiveserver, cover the full basketball court with a pregame show: school branding, each player’s name and number on the floor as they are introduced, and a sequence for the national anthem.

Fairfield Public Schools wanted their gym to feel like an arena on game night. They called Immersivegroup with one week to go.

The challenge

Fairfield High School’s gym has served the community for decades. Its players and fans watch professional basketball on TV, and the school wanted Friday nights to feel closer to that without renovating the building.

The first game was seven days away.

The experience

One Immersivegroup team did the design, engineering, content and installation.

  • Full-court projection mapping: six Immersivegroup projection systems aligned to cover the whole playing surface
  • Custom content: school colors, the mascot, and player introductions with each name and number
  • National anthem: a full-court sequence that plays before tip-off
  • Immersiveserver: playback, with all six projectors mapped, blended and kept in sync as one picture
  • Seven days from first call to game day, covering design, fabrication, content and installation
Immersivegroup projection systems deployed
6
From brief to gameday: design, content, install
7 days
Court surface coverage
100%
Team, no subcontractors
1
“The crowd went wild.”
— Dean Huppert, Marketing and Communications Director, Fairfield Public Schools

← All work

Tell us about your project

Send us the idea, the venue and the date. We will tell you what it takes to make it real.